Carlton Tower Hotel
The hotel’s famous health club ‘The Peak Fitness Club & Spa’ is set across three floors and has been completely redesigned. New treatment rooms have been created at the Talise Spa on the second floor and the swimming pool area revitalized. This pool is London’s largest in a hotel with natural daylight and its bright interior is complemented by views through its double height glass ceiling, lined with poolside cabanas for relaxation.
Project Summary
Location: Belgravia, London, England
Stainless Steel: #3 Polish (Grained)
Spa / Therapy Pool: 2.5m x 2.7m x 1.0m depth
Approximate Volume: 4.5m³
Pool Returns: 8
Construction: Built on site due to access issues. Remodelling of pool edge and renovation of existing pool
Grand Opening: June 2021
CPD FOR ARCHITECTS
Free CPD Swimming Pool and Moving Pool Workshop for Architects & Designers.
TALK TO US
Our team of expert pool design specialists are available to help. Speak with a technical engineer.
WATCH THE ACTION
Looking for pool inspiration? See our videos which showcase projects that we’ve completed.